How long does it take for F2 to fully cure?Updated 2 months ago
The full curing of the F2 coating takes 12 weeks.
The coating only fully cures in the water. After 24-36 hours, the Top Coat is already so resilient that the boat can be craned and repositioned. For launching, the final coat (Top Coat) only needs to be touch-dry.
Important Notes on Curing
First Feel: Immediately after application, the F2 Top Coat feels very sticky. This is normal and part of the curing process.
Accelerating Curing: Curing can be aided by moistening the surface.
"Early-Clean": After 8-12 weeks, an "Early-Clean" with a soft cloth or sponge is useful if needed, to remove the early biofilm and make subsequent colonization by macro-organisms more difficult.